Kategori Manajemen Proyek dan Manajemen Perawatan
Kategori Manajemen Proyek dan Manajemen Perawatan
Daftar Judul Training dan Instruktur Kategori Manajemen Proyek dan Manajemen Perawatan
NO | KODE | JUDUL TRAINING | LEAD INSTRUKTUR |
1 | PM-001 | AHLI DESAIN TEROWONGAN (TUNNEL DESIGN ENGINEER) | Toriq Arif Ghuzdewan,ST,MCSE |
2 | PM-002 | AHLI JAMINAN MUTU PEMANFAATAN BANGUNAN | Toriq Arif Ghuzdewan,ST,MCSE |
3 | PM-003 | AHLI K 3 KONSTRUKSI | Toriq Arif Ghuzdewan,ST,MCSE dan Drs. Suharyana, M.Kes |
4 | PM-004 | AHLI PENGAWASAN PEKERJAAN JEMBATAN | Toriq Arif Ghuzdewan,ST,MCSE |
5 | PM-005 | AHLI PERENCANAAN UMUM JALAN | Toriq Arif Ghuzdewan,ST,MCSE |
6 | PM-006 | AHLI PERKIRAAN BIAYA JEMBATAN | Toriq Arif Ghuzdewan,ST,MCSE |
7 | PM-007 | AHLI STRUKTUR KONSTRUKSI JEMBATAN | Toriq Arif Ghuzdewan,ST,MCSE |
8 | PM-008 | AHLI TEKNIK DESAIN JALAN (ROAN DESIGN ENGINEER) | Toriq Arif Ghuzdewan,ST,MCSE |
9 | PM-009 | ANALISIS DAN DESAIN STRUKTUR MENGGUNAKAN ETABS | Wahyu Bintoro, ST, CIPM and Team |
10 | PM-010 | ANALISIS HARGA SATUAN | Toriq Arif Ghuzdewan,ST,MCSE |
11 | PM-011 | APPLIED RISK ASSESSMENT INTO EPC PROJECT | Toriq Arief Ghzdewan,ST,MSCE |
12 | PM-012 | AUDIT HASIL PEKERJAAN KONSTRUKSI | Toriq Arif Ghuzdewan, ST, MSCE and team |
13 | PM-013 | BEST PRACTISE IN QUALITY ASSURANCE UNTUK PENYUSUNAN RENCANA MUTU KONTRAK KONSTRUKSI | Toriq Arif Ghuzdewan,ST,MCSE |
14 | PM-014 | BUILDING MANAGEMENT | Toriq Arif Ghuzdewan,ST,MCSE |
15 | PM-015 | BUILDING SUPERVISION AND QUALITY CONTROL OF CIVIL WORK | Toriq Arif Ghuzdewan,ST,MCSE |
16 | PM-016 | CLOSING AND HANDOVER PROJECT (PENUTUPAN DAN SERAH TERIMA PROYEK) | Toriq Arif Ghuzdewan,ST,MCSE |
17 | PM-017 | CONSTRUCTION METHODS AND CONSTRUCTION MANAGEMENT | Toriq Arif Ghuzdewan,ST,MCSE |
18 | PM-018 | DASAR-DASAR MANAJEMEN PROYEK | Dr. Ir. Fauzi Hasan. MM, MBA |
19 | PM-019 | DASAR-DASAR MANAJEMEN PROYEK | Dr. Ir. Fauzi Hasan. MM, MBA |
20 | PM-020 | FEED (Front End Engineering Design) Projec Control. | Toriq Arief Ghzdewan,ST,MSCE , Ir. Surono., |
21 | PM-021 | FINANCING ENERGY PROJECT & PROJECT STRUCTURING | Toriq Arief Ghzdewan,ST,MSCE |
22 | PM-022 | FLIGHT OPERATION OFFICER | Team Instruktur Penerbangan |
23 | PM-023 | GREEN BUILDING CONCEPT | Dr. Ir. H. Muslikh, M.Sc., M.Phil |
24 | PM-024 | LANDSCAPE DAN PERTAMANAN | Arief Heru Swasono IAI, IPM |
25 | PM-025 | MANAGING PROJECT EPC CONTRACT FOR SUCCESSFUL OIL AND GAS PROJECT | Toriq Arief Ghzdewan,ST,MSCE |
26 | PM-026 | MANAJEMEN FASILITAS DAN KESELAMATAN BANGUNAN GEDUNG DAN FASILITAS RUMAH SAKIT | Toriq Arif ghuzdewan,ST,MCSE dan Tugini ST MT |
27 | PM-027 | MANAJEMEN INFRASTRUKTUR | Toriq Arif Ghuzdewan,ST,MCSE |
28 | PM-028 | MANAJEMEN PERAWATAN BANGUNAN GEDUNG DAN FASILITAS | Toriq Arif ghuzdewan,ST,MCSE dan Tugini ST MT |
29 | PM-029 | Manajemen Perawatan Gedung & Fasilitas Dan Audit/manajemen energi Listrik Serta Safety Pencegahan Terhadap Bahaya Kebakaran Di Gedung | Tugino, ST MT & Team |
30 | PM-030 | MANAJEMEN PROYEK STRATEGI SUKSES DAN IMPLEMENTASI | Toriq Arief Ghzdewan,ST,MSCE |
31 | PM-031 | MANAJEMEN PROYEK IT | Toriq Arif Ghuzdewan,ST,MCSE dan Yuli Agusti Rochman, ST.,M.Eng |
32 | PM-032 | MANAJEMEN PROYEK KONSTRUKSI | Toriq Arif Ghuzdewan,ST,MCSE |
33 | PM-033 | MANAJEMEN PROYEK KONSTRUKSI DAN PEMELIHARAAN GEDUNG (BUILDING MAINTENANCE) | Dr. Ir. Fauzi Hasan. MM, MBA |
34 | PM-034 | Master Project Manager | American Academy Certified Consultant |
35 | PM-035 | MATERIAL MANAGEMENT FOR PROJECT | Drs Miswanto,M.Si |
36 | PM-036 | MERANCANG BANGUNAN GEDUNG DENGAN SKETCH UP | Toriq Arif Ghuzdewan, ST., MSCE |
37 | PM-037 | PELATIHAN PEMBINAAN INSINYUR DAN SERTIFIKASI INSINYUR PROFESIONAL | Tim Instruktur Persatuan Insinyur Indonesia |
38 | PM-038 | PENDIRIAN POLIKLINIK DAN RUMAH SAKIT KONSEP & APLIKASI | Drs H Moeljadi |
39 | PM-039 | PENGAWASAN BANGUNAN GEDUNG (BUILDING SUPERVISION) | Dr. Ir. H. Muslikh, M.Sc., M.Phil |
40 | PM-040 | PENGENDALIAN MUTU DAN ASPEK HUKUM PADA PROYEK KONTRUKSI | Toriq Arif Ghuzdewan,ST,MCSE |
41 | PM-041 | PENYUSUNAN ANGGARAN PERAWATAN BANGUNAN GEDUNG DAN FASILITAS | Toriq Arif Ghuzdewan,ST,MCSE |
42 | PM-042 | PENYUSUNAN KAJIAN TEKNIS BANGUNAN UNTUK SERTIFIKAT LAIK FUNGSI (SLF) | Ir. FX Pranoto Dirhan Putra,MURP |
43 | PM-043 | PENYUSUNAN RENCANA ANGGARAN BIAYA UNTUK PROGRAM KEMITRAAN BINA LINGKUNGAN | Toriq Arif Ghuzdewan,ST,MCSE |
44 | PM-044 | PLAXIS 2D BASIC TO INTERMEDIATE | Team Instruktur |
45 | PM-045 | PROJECT CONTROL MANAGEMENT | Dr. Ir. Fauzi Hasan. MM, MBA |
46 | PM-046 | PROJECT COST MANAGEMENT | Toriq Arif Ghuzdewan,ST,MCSE |
47 | PM-047 | PROJECT EXECUTION & MANPOWER MOBILITATION | Toriq Arif Ghuzdewan,ST,MCSE |
48 | PM-048 | PROJECT FEASIBILITY STUDY | Ir Ali Parkhan MT |
49 | PM-049 | Project Financing | Toriq Arif Ghuzdewan, ST, MSCE and team |
50 | PM-050 | Project Financing For Oil and Gas | Toriq Arif Ghuzdewan, ST, MSCE |
51 | PM-051 | PROJECT MANAGEMENT (MANAJEMEN PROYEK) | Toriq Arif Ghuzdewan,ST,MCSE |
52 | PM-052 | PROJECT MANAGEMENT (PM) | Dr. Ir. Fauzi Hasan. MM, MBA |
53 | PM-053 | PROJECT MANAGEMENT DENGAN MICROSOFT PROJECT | Toriq Arif Ghuzdewan,ST,MCSE |
54 | PM-054 | PROJECT MANAGEMENT DENGAN PRIMAVERA | Toriq Arif Ghuzdewan,ST,MCSE |
55 | PM-055 | PROJECT MANAGEMENT FOR ENGINEERING AND CONSTRUCTION | Toriq Arif Ghuzdewan,ST,MCSE |
56 | PM-056 | PROJECT MANAGEMENT FOR NON PROJECT MANAGER | Toriq Arif Ghuzdewan,ST,MCSE |
57 | PM-057 | PROJECT MANAGEMENT IN ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) | Toriq Arif Ghuzdewan, ST, MSCE |
58 | PM-058 | PROJECT MANAGEMENT OFFICE (PMO) | Dr. Ir. Fauzi Hasan. MM, MBA |
59 | PM-059 | Project Manager | American Academy Certified Consultant |
60 | PM-060 | PROJECT MONITORING AND EVALUATION | Toriq Arif Ghuzdewan,ST,MCSE |
61 | PM-061 | PROJECT RISK MANAGEMENT WITH MONTECARLO ANALYSIS | Toriq Arif Ghuzdewan,ST,MCSE |
62 | PM-062 | PROJECT SCHEDULING | Toriq Arif Ghuzdewan,ST,MCSE |
63 | PM-063 | PROJECT TIME MANAGEMENT (PTM) | Dr. Ir. Fauzi Hasan. MM, MBA |
64 | PM-064 | QUALITY ASSURANCE FOR ENGINEER | Toriq Arif Ghuzdewan,ST,MCSE dan Dr. Ir. H. Muslikh, M.Sc., M.Phil |
65 | PM-065 | QUALITY CONTROL OF CIVIL WORK (PENGENDALIAN MUTU PADA PROYEK KONSTRUKSI) | Toriq Arif Ghuzdewan,ST,MCSE |
66 | PM-066 | QUANTITY SURVEYOR | Toriq Arif Ghuzdewan,ST,MCSE |
67 | PM-067 | RENCANA KERJA DAN ANGGARAN PERUSAHAAN | Dr. Ir. Fauzi Hasan. MM, MBA |
68 | PM-068 | SAP 2000 & TEKLA For Analysist Structure | Faqih Maarif ST M.Eng |
69 | PM-069 | SAP 2000 DAN TEKLA | Faqih Maarif ST M.Eng |
70 | PM-070 | SILABUS PELATIHAN KELAYAKAN INVESTASI | Dr. Ir. Fauzi Hasan. MM, MBA |
71 | PM-071 | STUDI KELAYAKAN PROPERTI | Ir Ali Parkhan MT |
72 | PM-072 | System Dynamics Dengan STELLA | Joko Sulistio, ST.,M.Sc |
73 | PM-073 | TEAM BUILDING | Drs. Syafarudin Alwi |
74 | PM-074 | TEKNIK PENYUSUNAN ANGGARAN PROYEK | Toriq Arif Ghuzdewan,ST,MCSE |
75 | PM-075 | TEKNIK PENYUSUNAN HPS | Toriq Arif Ghuzdewan,ST,MCSE |
76 | PM-076 | VALUE ENGINEERING | Toriq Arif Ghuzdewan,ST,MCSE |
77 | PM-077 | SISTEM PENYEDIAAN AIR MINUM | Eko Siswoyo and team |
78 | PM-078 | STRUKTUR KAYU DAN BAMBU | Wahyu Bintoro and team |
79 | PM-079 | Penilaian Properti Komersial – Hotel, Retail,dll | IR. Rini Darmastiti,MSC,Phd |
80 | PM-080 | IR. Rini Darmastiti,MSC,Phd | IR. Rini Darmastiti,MSC,Phd |
Kunjungi website Kami : https://trainingeltasa.com/
Atau Kunjungi website kami di alamat : www.expertindo-training.com
Kunjungi website Lainnya: https://e-trainingonline.com/
Tags
About The Author